Skip to main content
Treasure Idaho

ESI Construction

Construction Schedule Manager

Meridian, IdahoConstructionPosted

Full-Time

About this job

The Construction

Schedule

Manager is responsible for building and managing project schedules to assist with the successful completion of construction projects. They will be responsible for all aspects of schedule control, including: building and maintaining a critical path schedule, integration of subcontract input, integration of the construction schedule into Client’s Master Schedule, monthly updates and reporting on schedule status, resource loading and reporting as required, assistance with change control when required, and keeping the Project Manager informed on areas of concern or options for schedule optimization. This position requires the applicant to be familiar with standard concepts, practices, and procedures related to CPM (Critical Path Method) scheduling.

Our Scheduling Manager position is based out of our Meridian, Idaho headquarters, with the flexibility of a hybrid work arrangement. This role will require weekly travel to our headquarters for in-person collaboration and team coordination.

Treasure Idaho saved part of this post, so the text above ends early. Read the full post on the ESI Construction site.

Where the job is

Pin from the listing for Meridian. Check the work address with the employer before you drive out.

More jobs at ESI Construction

All jobs

Similar jobs near Meridian

Moving here?

See what living in Meridian is like, and look at homes for sale there.

Ready to apply?

The application is on the ESI Construction site and opens in a new tab.

Keep going

Moving guide

Moving to Idaho

A short guide from Treasure Idaho: regions, seasons, jobs, new-home communities, and the questions worth asking before you pick a town. Download it, then poke around the cities and the map.

Then look through the cities and the map.